PT. CHINA RESOURCES GROUP INDONESIA was founded in 2016 and is generally responsible for the mining investment businesses in Indonesia. At present, the mining area which is put into production is located in an open pit coal mine of Kalimantan and mainly produces 3800Kcal/kg steam coal. The place of loading is located in the anchorage of East Kalimantan and the annual production capacity is about 3,100,000-3,800,000 tons.
Room 1207, Wing Tuck Commercial Centre,
177-183 Wing Lok Street, Hong Kong
info@china-ceg.com
Fix Phone:+852 2186 8888
Fax Phone:+852 2186 8866